Wales & West

Wales and West

The project consists of 16 above ground installations and design coordination works across four sites in Wales where Gas is metered out. The sites are located at Roose, St Mellons,  Newton Vastre and Marshfield, the sites are all classified as a non-strategic PRS with a variety of inlet pressures. All consist of  two-stream pressure reduction systems.