Lebanon Gas Pipeline

Lebanon Gas Pipeline

Client: The Ministry of Energy and Water for the Republic of Lebanon

36″ Gas Pipeline from Tripoli to Tyre. Construction of a natural gas line between Tyre and Tripoli. The total length of the line is approximately 170km of which approximately 50km will be offshore. Preparation of tender documents. The basic onshore pipeline route is to be within the domain of the Lebanese railway and passing through the premises of the Zahrani Oil Installations.

The project will be developed in four phases as follows:

  • Phase 1 from Tripoli to Salaata.
  • Phase 2 Salaata to Greater Beirut
  • Phase 3 Offshore
  • Phase 4 Khaldeh Region to Tyr